The eighty-year old concert hall floor was carefully documented and replaced with new construction identical to the original. Precise board width, layout, and herringbone corner motifs were respected. The very particular species and cut of wood were matched for both aesthetic and technical reasons. Finish products were selected to balance environmental concerns with the durability required of a high use public area.